Measuring Energy Efficiency in Boiler Rooms Using Flow Meters
Water Test Station PLC Revision involves transitioning the water test conveyor system from a Profibus system to Profinet and upgrading the conveyor PLC from PLC400 to the 1518 series.
Front Windshield Robot Profinet Transition, Conversion of the assembly line front windshield robot from Profinet and PLC400 to PLC 1518F.
10P0 Varnish Cabin Ventilation Drive Renovation involves replacing the ABB drives in the Varnish ARP system with new Siemens profinet drives and commissioning them. Converting the Profibus system to a profinet infrastructure.
Ensuring the conversion of equipment connected to the ASP1 selectivity buffer area from Profibus infrastructure to Profinet, creating and commissioning a SCADA room.
J74 Mezzanine Area Conveyor Installation, installation and commissioning of the Buffer station and skid return line that facilitate the transfer of Custom and WV Transporter vehicles from the paint shop area to the assembly area.
Installation and commissioning of the J74 production line 5-station transfer conveyor.
ARP 7P0 Drive Renovation, replacement of ABB drives in the 7P ARP system with Siemens drives, replacement of the Profibus infrastructure with Profinet.
Conversion and commissioning of the Transit Gate line PA3 region profibus infrastructure to Profınet infrastructure.
Conversion and commissioning of the Transit Gate line PA12 region's Profibus infrastructure to Profinet infrastructure.
It is the increase of the EC line capacity within the paint shop.
A second robot has been added to the CCB station, and with this improvement, the cycle time has been increased.
An additional manual painting process has been added for the handstation concept of Line 2 automatic paint booth, and the system has been commissioned.
As part of the H625 door hood sealer project, the transition of the H625 manual door and hood sealer process to a robotic system has been completed.
Revision for Lowering VBK Hoist Driver Panels to the Subfloor, Manufacturing of 15 Hoist Driver Panels, Commissioning of S120-G120 Drivers, and PLC Software Integration and Commissioning
Installation of Buffer Stations for Electric Vehicle Motors, Electrical-Mechanical-PLC Software and Commissioning
Manufacturing of new electrical panels on the 1C0 line, conversion of the existing profibus infrastructure on the line to profinet, PLC software update, and commissioning.
Determining and Transferring Line Locations by Separating Vehicles and Batteries
30K 6.5 Conveyor Installation at Kotunda Distribution of Batteries and Vehicles to Line Locations
Increasing the number of Metal Finish stations from 1 to 3 and expanding the capacity of the YBA area.
Installation of 22 smart pumps in the paint preparation room and commissioning by transferring information to the paint robots via the SCADA system.
Conversion of the manual press line to an automatic station
Integration of the driver for the 200kW ventilation system
B460 Bodywork – Final inspection – SVO – Pluggauge – Infocenter – FPA – Buffer path revisions and relocation
Conversion of the manual fixture into a 3-position automatic fixture.
Mechanical, electrical, and PLC commissioning of the electric motor chassis welding cell.